Gatineau Ensuite Remodeling
Ensuite bathroom + walk-in
Back to Portfolio

The Challenge
Two small bedrooms and a cramped bathroom on the top floor of a stone home, with no way to run new drainage on the existing path.
Our Approach
We removed the partition, rebuilt the floor structure to allow a new drain run inside the joist bays, and waterproofed the entire wet zone before tiling.
The Result
A full ensuite with a freestanding tub, curbless shower and heated stone floor, plus a walk-in closet where the old hallway dead-ended.
- Location
- Gatineau
- Year
- 2025
- Scope
- Ensuite bathroom + walk-in
- Duration
- 6 weeks
- Service
- Renovation Projects

